Backup Power for Data Centres

An engineering solution for backup power to IT infrastructure. The generator set is designed as part of the wider system, together with utility feeds, UPS equipment, power distribution, cooling and controls.

What the design must address

Design work assesses server-room loads, supporting systems and site-wide infrastructure. The project also defines the responsibilities of the generator and UPS, transfer logic, status monitoring and the customer’s testing requirements.

  • server rooms and network equipment;
  • UPS systems and electrical distribution;
  • cooling, ventilation and pump groups;
  • monitoring, fire-safety and access-control systems.

Integration with building systems

Equipment is selected against the project load and operating conditions. The design reviews cooling-system start-up, power-restoration sequence, control-signal compatibility and whether tests can be conducted without unacceptable impact on IT loads. Autonomy and redundancy parameters are set by the project; no uptime level is implied without that design.

Project stages

  1. Review the technical brief and power-system drawings.
  2. Agree calculated loads and transfer scenarios.
  3. Select equipment and prepare the integration design.
  4. Install, commission and verify control interfaces.
  5. Agree the maintenance schedule.

Related information: industrial generator solutions and contact an engineer.

Request a technical discussion

For an initial review, prepare a single-line diagram, load list, transfer requirements and site information.

Discuss a data-centre project →